Engineering Projects


Articles

Screen shot 2009-12-16 at 12.42.49 PM
Palm Beach International - A Space-Age Approach to Fire and Safety Systems (pdf)
By Aaron McDonald, P.E., President and Chief Electrical Engineer, Brabham, Debay & McDonald, Consulting Engineers, Electrical System Design, March 1989

The new Palm Beach International Airport Terminal Complex a 158 million dollar project with a mile long building, includes an extensive fire detection, alarm and security network that also serves other functions.


“Airport Electrical System Provides Power It Can Count On” (pdf)
By Aaron McDonald, P.E., President and Chief Electrical Engineer, Brabham, Debay & McDonald, Consulting Engineers, Electrical System Design, October 1989

The new Palm Beach International Airport, through the use of engine-generator sets and an innovative concept of utilizing switchgear, has an efficient and dependable electrical system.

“Palm Beach Airport sets access control standards” (pdf)

Screen shot 2009-12-16 at 12.44.51 PM
Palm Beach International is one of the nation’s first airports to meet new access control regulations.

Drawings
3D of cable tray for press and robots (pdf)
2008 Our Lady of Lourdes online model (pdf)
PLC Terminal Cabinet Wiring Diagram (pdf)

McDonald Engineering Pamphlet